Breathing New Life into Seized up Hangar Doors

October 16, 2018 4:13 pm Published by Comments Off on Breathing New Life into Seized up Hangar Doors

Our client called us in to carry out repair work on seized up hangar doors made up of eleven leaves. The job was to supply and fit twenty-two new bespoke fabricated bottom wheels complete with bearing and grease nipples. Previously a minimum of three... Read more

RAS Equipment Case Study

January 20, 2016 11:29 am Published by Comments Off on RAS Equipment Case Study

AM Defence & Marine were approached by a shipyard to offer a RAS solution for two tankers being converted from merchant ships into naval refuelling ships. The expectation of the client was the delivery of diesel fuel to receiving ships at a... Read more

Water Treatment Works Large Jib Crane for Pump Removal

August 21, 2015 1:41 am Published by Comments Off on Water Treatment Works Large Jib Crane for Pump Removal

Brief:      Supply and fit a large 5m high x 8m radius 2 tonne swing jib crane with powered slew and electric hoist. All suitable for coastal exposed conditions. What we did:     The customer contacted our design department with a... Read more

Production of Custom Floor Crane for Removal of Outboard Motors

August 21, 2015 1:41 am Published by Comments Off on Production of Custom Floor Crane for Removal of Outboard Motors

Brief:     The customer had a requirement for lifting outboard motors in outstations which did not have the availability of overhead craneage. The motors were to be lifted from a transportation crate onto a RIB which was situated on a... Read more

Dressing Lines on Cruise Ships Case Study

August 21, 2015 1:40 am Published by Comments Off on Dressing Lines on Cruise Ships Case Study

There have been several reported incidents of failures to components in ships dressing line systems. In a recent failure a sheave block failed causing the dressing line to fall into a swimming pool. AM Defence & Marine were asked to... Read more

Barracks Replacement Doors

August 21, 2015 1:40 am Published by Comments Off on Barracks Replacement Doors

Our client had a number of old sectional doors which were becoming difficult to maintain, whilst some were non functioning. We attended site to view the existing doors and take measurement for their replacement. As the existing doors were un-insulated we recommended... Read more

Height Safety Case Study

August 21, 2015 1:40 am Published by Comments Off on Height Safety Case Study

Falls from height are the most common cause of fatal injury and the second most common cause of major injury to employees today. Fall protection is now a key issue for all businesses whose employees need to operate at height.... Read more